During the production process, Stool Mould failures often occur

  •   On the premise of ensuring product quality, the injection cycle time should be as short as possible. The shorter the injection cycle time, the more the production quantity, and the lower the manufacturing cost per unit product. The injection cycle time includes: injection time, pressure holding time, cooling time (melting time), mold opening time, ejection time (including pressure holding time), door opening time, reclaiming time, door closing time, mold clamping time (special circumstances) It also includes the forward/backward time of the shooting stage and the time to spray the release agent).

      The most important way to shorten the injection cycle time is to reduce the wall thickness of the plastic furniture mold of the plastic part/runner size (shorten the cooling time), reduce the opening and closing distance/thimble stroke, quickly take out the product, manipulator operation, and speed up the safety door opening/closing speed, reduce the phenomenon of plastic parts sticking to the mold, choose the correct cooling time, and reasonably set the on/off speed and ejection speed/number of times.

      "Scrap is the biggest waste." If there is a high rate of defective products, large scrap or returns in the injection molding process, the loss of raw materials, electricity, labor, and equipment (excluding other costs) will be very high. big.

      If the Stool Mould is not properly maintained, Stool Mould failures will often occur during the production process, requiring frequent shutdowns for maintenance. This will affect the smooth production and quality stability of rubber parts and will cause economic losses to the enterprise (such as mold repair costs, plastic materials/power consumption, labor costs, downtime losses, etc.)

      Pitcher Mould is also our product, welcome to consult and purchase.